As you can see we have made progress in our kitchen with the drywall! We also now have electric completely wired in the master bedroom - and it's only Saturday. I've also spent a lot of time this past week patching brick along the stairwell wall (not pictured).
Saturday, January 24, 2009
Watch our kitchen become a room!
As you can see we have made progress in our kitchen with the drywall! We also now have electric completely wired in the master bedroom - and it's only Saturday. I've also spent a lot of time this past week patching brick along the stairwell wall (not pictured).
Monday, January 19, 2009
Master Bedroom
Yard
Sunday, January 4, 2009
Current projects
Moved In!
We finally and prematurely moved into the house on December 1st. The first night was fun and reality hit by day two. We spent the first 3 weeks trying to get our furnace working, turns out our contractor incorrectly installed the venting which resulted in the furnace shutting off shortly after it would start to heat up! Luckily it was an easy fix once the problem was discovered, and it forced us to run much of the ducting throughout out the house. We also worked quickly to finish gutting the downstairs to help limit the amount of dust we live with. Here are pictures of our bathroom which is almost finished, and a hall closet we built next to the door to the small bedroom (the one we are currently in).
Subscribe to:
Posts (Atom)