Tuesday, March 17, 2009

Kitchen





We have slowed down a bit on the house work over past month as it was burning us out. We've gotten back into the swing a bit though. We had to re-level our kitchen floor, partly because it may not have been perfectly level to begin with and there was a major leak in our water lines after they were installed. We were able to level the floor with thin sheets of plywood and a lot of large shims. We have the 1st coat of primer on the walls and the ceiling is painted. John also entirely re-wired our kitchen light (ebay purchase), and to my amazement it worked and there are no extra pieces that I know of. The master bedroom floors are coming along. We've filled in all the cracks and holes throughout and now it needs the final sanding passes then we will poly.

No comments: