Sunday, November 23, 2008

Electric, Insulation, Windows




















Our house is finally sealed from the outdoor elements! Our 3rd upstairs window went in today, and the house already feels a bit warmer. We have also been very busy wiring two bedrooms and half of the kitchen. It's amazing how exciting hitting a light switch can be.

The master bedroom has been mostly gutted, only the ceiling wood lathe left




Bathroom


We have been very busy over the last few weeks. The bathroom has been 95% tiled, we just need to add a few pieces of trim. The bathroom door is in place. And we rebuilt our vanity to hold our 1920's sink.

Monday, November 10, 2008

Tiling













This weekend John and I leveled out our bathroom floor to prepare for the tile. I tiled the bathroom floor, which still needs to be cleaned up and grout added. I also insulated the ceiling of another bedroom. There is also a picture of a bedroom window that was recently installed.

Monday, November 3, 2008

Window with trim




Today I made the sill and trim for our bathroom window. I must say it turned out quite well and I look forward to finishing other windows! I also painted the interior of one side of our skinny bath closet. We've worked on numerous other tasks throughout the house which I can't begin to keep track off. We have our refrigerator at the house now, although it's not yet plugged in.