We have slowed down a bit on the house work over past month as it was burning us out. We've gotten back into the swing a bit though. We had to re-level our kitchen floor, partly because it may not have been perfectly level to begin with and there was a major leak in our water lines after they were installed. We were able to level the floor with thin sheets of plywood and a lot of large shims. We have the 1st coat of primer on the walls and the ceiling is painted. John also entirely re-wired our kitchen light (ebay purchase), and to my amazement it worked and there are no extra pieces that I know of. The master bedroom floors are coming along. We've filled in all the cracks and holes throughout and now it needs the final sanding passes then we will poly.